Lifecycle vs Element Costs: A New Approach to Optimize the Power Supply System Design in Railways Infrastructures

Lifecycle vs Element Costs: A New Approach to Optimize the Power Supply System Design in Railways Infrastructures

M. Soler | J. López J.M. Mera | J. Maroto

CITEF, Railway Technology Research Centre of the Universidad Politécnica de Madrid, Madrid, Spain

Page: 
481-490
|
DOI: 
https://doi.org/10.2495/TDI-V1-N3-481-490
Received: 
N/A
|
Revised: 
N/A
|
Accepted: 
N/A
|
Available online: 
30 April 2017
| Citation

OPEN ACCESS

Abstract: 

Electrification systems applied to railway systems have high complexity to achieve the optimum in several terms. These terms could be separated in energy supply and budget costs, such as direct and indirect costs, all of them derived from the implantation of the electrification system along the railway line. Starting from the experience in several projects carried out in CITEF (Railway Research Center in Technical University of Madrid), a new research way has grown up. The main goal has been an expert system, which is able to improve substantially the design process of power supply systems in railways, such as in AC as DC. Bearing in mind the specific constraints in terms of budget and electric standards, the expert system is able to determine a set of possible design scenarios. Each of them has the number, type and location for the main elements (catenary, substation, autotransformer, etc.). In this article a step forward is presented. This new step would apply a better way to choose between elements, hence taking into account the relationship between lifecycle versus element cost or losses avoided in the infrastructure. This has been applied to the main elements like traction substations, autotransformers, catenary and impact on maintenance and environmental zones. This new concept for evaluation has been integrated in the objective functions. These functions are the managers for the guidance of the optimization method, in this case genetic algorithm AMGA-II, in order to achieve the final Pareto Front. This Pareto Front contains the several possibilities which the designers must evaluate to accomplish their goals to power supply system.

Keywords: 

AMGA-II, life-cycle costs (LCC), maintenance and environmental zones, optimization, power supply design (PSD)

  References

[1] Soler, M., López, J., Mera, J. M. & Tapia, S., Expert system using multi-objective optimizationof the direct current railway power supply system. Transport, pp. 1–12, 2015.

[2] Soler, M., López , J. & Mera, J. M., Simulation system for the optimization of a blockdistribution under the ERTMS-1 signalling system, de Computer in Railways XII, WITPress, pp. 61–73, 2012.

[3] Deb, K., Amnit , P. & Sameer, A., A fast and elitist multiobjective genetic algortihmNSGA-II. IEEE Transactions on Evolutionary Computation, 6(2), pp. 182–197, 2002.DOI: 10.1109/4235.996017.

[4] Soler, M., López, J., Mera , J.M. & Maroto, J., Methrodology for Multiobjective Optimizationof the AC Railway Power Supply System. IEEE Transactions on Intelligent TransportationSystems, 15(5), pp. 2531–2542, 2015. DOI: 10.1109/TITS.2015.2412460.

[5] Tiwari, S., Fadel, G. & Deb, K., AMGA2: improving the performance of the archivebasedmicro-genetic algorithm for multi-objective optimization. Engineering Optimization,43(4), pp. 377–401, 2011. DOI: 10.1080/0305215X.2010.491549.

[6] Rondón, I., Calache ,V. & Rojas, F., Metodología para estimar la vida útil del autotransformadorAT-4, 700 MVA de la subestación Guayana ‘B’ debido a sobrecargas.Universidad Ciencia y Tecnología, 17(64), 2014.

[7] Chester, M. & Horvarth, A., Life-cycle assessment of high speed rail: the case of California.Environmental Research Letters, 5(1), 2010. DOI: 10.1088/1748-9326/5/1/014003.

[8] Abbes, D., Martinez ,A. & Champenois, G., Life cycle cost, embodied energy and lossof power supply probability for the optimal design of hybrid systems. Mathematics andComputers in Simulation, 98, pp. 46–62, 2014. DOI: 10.1016/j.matcom.2013.05.004.

[9] Cerri, D., Taisch, M. & Terzi, S., Multi-objective Optimization of Product Life-CycleCosts and Environmental Impacts. Advances in Production Management Systems.Competitive Manufacturing for Innovative Products and Services, pp. 391–396, 2012.

[10] Salim, V. & Xiaoqiang, C., A genetic algorithm for railway scheduling with environmentalconsiderations. Environmental Modelling and Software, 12(4), pp. 301–309,1997. DOI: 10.1016/S1364-8152(97)00026-1.

[11] Baumgartner, J.P., Prices and Costs in the Railway Sector, Zurich: Institut des Transportet de planification, 2001.

[12] Açıkbaş ,S., & Turan Söylemez, M., Energy loss comparison between 750 VDC and1500 VDC power supply systems using rail power simulation, de Computers in RailwaysIX, WIT Press, pp. 951–960, 2004.

[13] Chuang, H., Chen, C., Lin, C., Chen, Y. & Ho, C., Optimal Expansion Planning ofTraction Substations for an Electrified Mass Rapid Transit System. de InternationalConference on Power System Technology, pp. 1-7, 2006.

[14] Hinow ,M. & Mevissen, M., Substation maintenance strategy adaptation for life-cyclecost reduction using genetic algorithm. IEEE Transactions on Power Delivery , 26(1),pp. 197–204, 2011. DOI: 10.1109/TPWRD.2010.2065247.

[15] Fisher, I., The Theory of Interest, New York: The Macmillan Company, 1930.