Implementing Wastewater Treatment Projects Through Build–Operate–Transfer Contracts

Implementing Wastewater Treatment Projects Through Build–Operate–Transfer Contracts

A.C. Karmperis A. Sotirchos K. Aravossis I.P. Tatsiopoulos 

Sector of Industrial Management and Operational Research, School of Mechanical Engineering, National Technical University of Athens, Greece.

Page: 
237-251
|
DOI: 
https://doi.org/10.2495/SDP-V7-N2-237-251
Received: 
N/A
| |
Accepted: 
N/A
| | Citation

OPEN ACCESS

Abstract: 

This paper focuses on the initial assessment of wastewater treatment (WT) projects through Public Private Partnerships (PPPs). Due to the fact that the initial investment of a PPP-type WT project is too high and can be financed by both the public and private sectors, crucial during the project’s feasibility stage is to estimate the partners’ funding rates. Herein, the financial analysis that is included in the cost benefit analysis methodology as well as the quantitative value for money assessment method are used, in order to introduce a new process that estimates the funding ratios of the partners. Specifically, the process calculates the upper and lower boundaries of the public and private sectors’ funding ratios in the initial investment, which include all the funding scenarios that are profitable for both partners. It applies mostly in the WT projects that are considered to be implemented through the build–operate–transfer contract type, which is probably the most commonly used type in PPPs. The new process is used in a WT project case study, in which alternative funding scenarios of the initial investment are examined and two specific funding scenarios are distinguished, which include all the possible funding ratio values by the public and the private parts. The process that is presented here can be a useful tool to decision makers, because it helps them to evaluate different funding scenarios of the initial investment and to select the most suitable in each case option, that will be profitable for both partners.

Keywords: 

cost benefit analysis, funding scenarios, Public Private Partnerships, value for money, wastewater

  References

[1] Abdulaal, W.A., Public-private partnership in regenerating unplanned settlements in Jeddah. International Journal of Sustainable Development & Planning, 6(2), pp. 181–194, 2011.

[2] Jones, R. & Noble, G., Managing the implementation of public-private partnerships. Public Money and Management, 28(2), pp. 109–114, 2008. doi: http://dx.doi.org/10.1111/j.14679302.2008.00629.x

[3] Reeves, E., Public Private Partnerships in the Irish Roads Sector: an Economic Analysis.  Research in Transportation Economics, 15(1), pp. 107–120, 2005. doi: http://dx.doi. org/10.1016/S0739-8859(05)15009-4

[4] Grimsey, D. & Lewis, M.K., Evaluating the risks of public private partnerships for infrastructure projects. International Journal of Project Management, 20(2), pp. 107–118, 2002. doi: http://dx.doi.org/10.1016/S0263-7863(00)00040-5

[5] Bovaird, T., Public–private partnerships: from contested concepts to prevalent practice. International Review of Administrative Sciences, 70(2), pp. 199–215, 2004. doi: http://dx.doi. org/10.1177/0020852304044250

[6] Zitron, J., Public–private partnership projects: Towards a model of contractor bidding  decision-making. Journal of Purchasing & Supply Management, 12(2), pp. 53–62, 2006. doi: http://dx.doi.org/10.1016/j.pursup.2006.04.002

[7] Maskin, E. & Tirole J., Public–private partnerships and government spending limits. International Journal of Industrial Organization, 26(2), pp. 412–420, 2008. doi: http://dx.doi. org/10.1016/j.ijindorg.2007.05.004

[8] Ruuska, I. & Teigland R., Ensuring project success through collective competence and creative confl ict in public–private partnerships – A case study of Bygga Villa, a Swedish triple helix e-government initiative, International Journal of Project Management. 27(4), pp. 323–334, 2009. doi: http://dx.doi.org/10.1016/j.ijproman.2008.02.007

[9] Sotirchos, A., Karmperis, A.C., Aravossis, K. & Tatsiopoulos, I., Financial sustainability of the waste treatment projects that follow PPP contracts in Greece: a formula for the calculation of the profi t rate. Ecosystems and Sustainable Development VIII, WIT Transactions on Ecology and the Environment, 144, eds. Y. Villacampa & C.A. Brebbia, WIT Press: Southampton, pp. 285–299, 2011.

[10] Grimsey, D. & Lewis, M.K., Public Private Partnerships, the Worldwide Revolution in Infrastructure Provision and Project Finance (Chapter 1). The nature of partnerships, Edward Elgar: Cheltenham, pp. 5–9, 2007.

[11] Yescombe, E.R., Public-Private Partnerships: Principles of Policy and Finance (Chapter 2). PPPs-For and Against, Published by Elsevier Ltd: Oxford, pp. 15–28, 2007.

[12] Smith, N.J., Engineering Project Management, Blackwell Science Ltd: Oxford, pp. 321–323, 2002.

[13] World Bank Group, PPP in Developing Countries, 2007 data results from the PPI Project Database, The World Bank Group, Public Private Infrastructure Advisory Facility, pp. 13–19, http://ppi.worldbank.org/

[14] Federal Highway Administration, Synthesis of public private partnership projects for roads, bridges and tunnels from around the world 1985–2004, U.S. Department of Transportation, Washington, D.C., pp. 9–10, 2005.

[15] Panggabean, A.T.P., Expanding Access to Basic Services in Asia and the Pacifi c Region:  Public-Private Partnerships for Poverty Reduction, Asian and Development Bank, ERD  Working Paper, No 87, pp. 1, 7, 14, 2006.

[16] Chiu, Wai-ip, How to Launch a Successful BOT Project, Edmond University of Hong – Kong, Thesis submitted, pp. 34, 1998.

[17] Asian Development Bank, Technical Assistance for Public Private Community Partnerships in Urban Services for the poor, A. 2, pp. 1–2, 2000.

[18] Zhang, X-q. & Kumaraswamy, M.M., Hong Kong experience in managing BOT projects, Journal of Construction Engineering and Management. 127(2), pp. 154–162, 2001. doi: http://

dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:2(154)

[19] Haarmayer, D. & Mody, A., Financing Water and Sanitation Projects – The Unique Risks, The World Bank Group, Finance, Private Sector and Infrastructure Network, 151, pp. 1–4, 1998.

[20] European Commission, Guidelines for Successful Public – Private Partnerships, Directorate – General Policy, pp. 14, 2003.

[21] European Commission, Green Book on Public Private Partnerships, Directorate – General Policy, COM 327, fi nal, 2004.

[22] European Commission, Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions on PPP’s and Community Law on Public Procurement and Concessions, Brussels, 569, par. 2.3.1, 2005.

[23] European Parliament, PPP’s National Experiences in the European Union, Union’s Internal Policies, Direct. A, Economic and Scientifi c Policy, 2006.

[24] United Nations, Guidebook on Promoting Good Governance in Public Private Partnerships, Economic Commission for Europe, pp. 68–69, 2008.

[25] Ye, S. & Tiong, R.L.K., NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management, 126(3), pp. 227–233, 2000. doi: http://

dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:3(227)

[26] HM Treasury, How to appoint and work with a preferred bidder, Technical Note No. 4, Treasury Taskforce, Private Finance, HMSO, London, 1999.

[27] Offi ce of Government Commerce, Green public private partnerships, Norwich, pp. 4–5, 2002.

[28] Grimsey, D. & Lewis M.K., Are Public Private Partnerships value for money? Evaluating alternative approaches and comparing academic and practitioner views, Accounting Forum. 29(4), pp. 345–378, 2005. doi: http://dx.doi.org/10.1016/j.accfor.2005.01.001

[29] HM Treasury Taskforce, How to manage the delivery of long term PFI contracts, Technical note No.6-London, 2003.

[30] HM Treasury, Value for money assessment guidance, London, 2004.

[31] Partnerships Victoria, Partnerships Victoria - Public sector comparator, Department of Treasury and Finance, Victoria, Australia, 2003.

[32] Spackman, M., Public–private partnerships: lessons from the British approach. Economic Systems, 26(3), pp. 283–301, 2002. doi: http://dx.doi.org/10.1016/S0939-3625(02)00048-1 [33] HM Treasury, http://www.hm-treasury.gov.uk/d/pfi _signed_projects_list.xls [34] HM Treasury, PPP’s, the Government’s Approach, pp. 10, London, 2000.

[35] Department for Transport, Green Public Private Partnership, UK, p. 4, 2002.

[36] HM Treasury, Value for Money Assessment Guidance, London, 2006.

[37] HM Treasury, PFI Value for Money Quantitative Assessment, Evaluation Spreadsheet, http://www.hm-treasury.gov.uk/d/vfm_qe_spreadsheet0307.xls

[38] Zhang, X., Critical Success Factors for PPPs in Infrastructure Development. Journal of Construction Engineering & Management, 131(1), pp. 3–14, 2005. doi: http://dx.doi.org/10.1061/ (ASCE)0733-9364(2005)131:1(3)

[39] Van Ham, H.& Koppenjan, J., Building PPPs: Assessing and managing risks in port development, Public Management Review. 4(1), pp. 593–616, 2002.

[40] European Commission, Resource Book on PPP Case Studies, Directorate – General Regional Policy, pp. 9, 2004.

[41] European Commission, Guide to Cost–Benefi t Analysis of Investment Projects, pp. 13–15, 2008.

[42] European Union Offi cial Journal, Council Regulation (EC) No 1083/2006, of 11 July, 2006: Chapter II, Section 2, Article 39–40, 2006.

[43] Karmperis, A.C., Sotirchos, A., Aravossis, K. & Tatsiopoulos, I., Funding evaluation model for the implementation of wastewater treatment projects through Public Private Partnerships.  Environmental Economics and Investment Assessment III, WIT Transactions on Ecology and the Environment, 131, eds. K. Aravossis & C.A. Brebbia, WIT Press: Southampton, pp. 147–160, 2010

[44] Karmperis, A.C., Sotirchos, A., Aravossis, K. & Tatsiopoulos, I. Waste management project’s alternatives: A risk-based multi-criteria assessment (RBMCA) approach. Waste Management, 32(1), pp. 193–211, 2012.

[45] United Nations, Guidelines on Municipal Wastewater Management, UN Environmental Programme, pp. 48–51, 2004.

[46] Organisation for Economic Cooperation & Development, Handbook for Appraisal of Environmental Projects Financed from Public Funds, Environmental Finance, pp. 64–66, 2007.

[47] Asian Development Bank, Guidelines for the Economic Analysis of a Project, Economics and Development Resource Centre, pp. 167, 1997.

[48] Aravossis, K. & Karydis, V., Combination of monetary valuation techniques and application to environmental impact receptors, Fresenius Environmental Bulletin, 13(3b), pp. 283–288, 2004.

[49] Latinopoulos, D., Valuing the services of coastal ecosystems: A meta-analysis of contingent valuation studies, International Journal of Sustainable Development & Planning, 5(1), pp. 13–30, 2010. doi: http://dx.doi.org/10.2495/SDP-V5-N1-13-30

[50] Pearce, D., Atkinson, G. & Mourato, S., Cost-Benefi t Analysis and the Environment: Recent Developments, OECD publishing, pp. 253–267, 2006.

[51] HM Treasury, The Green Book: Appraisal and Evaluation in Central Government, London, Annex 2: Valuing non-market impacts, pp. 57–67, 2004.

[52] Day, B.H., The theory of hedonic markets: obtaining welfare measures for changes in environmental quality using hedonic market data, Research report, Centre for Social and Economic Research on the Global Environment (CSERGE) Publications, London, 2001.

[53] Karmperis, A.C., Sotirchos, A., Aravossis, K. & Tatsiopoulos, I.A. cooperative game theory approach for the equal profi t and risk sharing, Proc. of the 2nd European Conference of Systems (ECS 11), Puerto De La Cruz, Tenerife, Spain, December 10–12, 2011.